AM Cleanroom Build and Performance (AMCBP) was hired by a high-tech engineering and construction firm to replace fan filter units throughout their 15,000+ square foot facility during a brief shutdown period.
The new fan filter units must be installed correctly to meet ISO specifications because of the role they serve in filtering out harmful airborne particles from the recirculated air.
AMCBP was chosen for this critical project because of our reputation for quality work and ability to hit tight deadlines.
“We came with a solution to perform the scope without interrupting existing operations, and our project-ready team completed the job as promised,” says David Logston, Project Manager.