AM Cleanroom Build and Performance (AMCBP) recently completed a cleanroom repair project for a semiconductor facility in the Southern United States.
This client had a slow-leaking tool corrode a section of flooring in their cleanroom environment and required an experienced team to fix the area so a new tool could be installed.
“After decontamination, our project-ready team removed the floor system, resurfaced the concrete, painted on epoxy, and installed pedestal legs for the new floor to sit on,” says David Logston, AM Cleanroom Build & Performance Project Manager.
“We complete jobs with the professionalism, speed, and attention to detail you deserve, regardless of project size or pre-existing relationships,” finished Logston.
For a NEBB-Certified company with over 5,000 projects completed, Contact AMCBP Today!