AM Technical Solutions (AM) recently won a cleanroom construction project to support a global company’s semiconductor production lines. We will be providing cleanroom construction support at the company’s domestic facility in the Southwestern U.S.
The project will support Phase II of the customer’s long-term facility expansion plans, which will expedite semiconductor production as well as research and development (R&D) efforts.
Our scope of work focuses on two critical areas of cleanroom construction: the cleanroom ceiling system and the cleanroom walls. We are confident that our teamwork, expertise, and strong project coordination will enable us to complete the project with a first-time-right mentality.
Cleanroom Construction Project Deliverables
The project includes key components for both the cleanroom ceiling system and the cleanroom walls that will require us to leverage our technical expertise.
– The cleanroom ceiling system includes project work for the main cleanroom ceiling and the gown room ceiling grid.
Main Cleanroom Ceiling
- Interstitial ceiling support consisting of BTB strut, threaded rod, brackets, and fasteners.
- Installation of 13 plenum fan boxes of various sizes.
- Provision of 4×4 Bottom Load Filters with 100% coverage.
- Inclusion of shop drawings.
- Support for sprinkler head installation.
- Full cleanup of project work.
Gown Room Ceiling grid
- Interstitial ceiling support consisting of strut, threaded rod, brackets, and fasteners.
- Provision of our company’s gasketed grid system.
- Pre-installed poron gasket.
- Alignment with grid layout.
- Installation of gold bond gridstone cleanroom ceiling tile.
- Provision of shop drawings.
- Full cleanup of project work.
– Regarding the cleanroom walls, we will be providing specific cleanroom construction services in alignment with cleanroom wall section drawings.
- Installation of liner wall system to spec.
- Installation of Modular Wall to spec.
- Provision of polar white panels.
- Assurance that all extrusions are Anodized AL.
- Development of shop drawings.
- Full cleanup of project work.
“We are pleased to win this cleanroom construction project to help our customer elevate their semiconductor production capabilities and R&D efforts,” says Robert Logston, SVP Construction. “I am confident that our team will complete the project on-time, on-budget, and of the highest quality to the satisfaction of the customer.”
– Find out more about our cleanroom construction services for the semiconductor market.